Jump to content
Fly Fusion Forums

Recommended Posts

Posted

Folks,

 

This just scared the crap outta me.

 

At the rate these folks work Encana's THE BOW should be finished in about 2 weeks and the bridge to nowhere after lunch.

 

Don

Posted

cool. witnessed some of that first hand, during construction leading up to the previous summer olympics there.

the planning and coordination involved boggles the mind. as do the costs. that project was also heavy on equipment and tools...lots of things are still done much more by hand and manually. some quality and safety standards [in some cases] are not the same as here.

bottom line however...when china wanna git 'er dun, they git 'er dun.

 

 

Guest Sundancefisher
Posted
Folks,

 

This just scared the crap outta me.

 

At the rate these folks work Encana's THE BOW should be finished in about 2 weeks and the bridge to nowhere after lunch.

 

Don

 

Still THE BOW is being built in the same time it takes the City to build two downtown Ctrain platforms. If the City works any slower they will start going backwards.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...